ICC Management โ Building Facilities & Security DivisionREF: ICC-BFS-FL14-2024 ยท Produced to Pune Police: 7 March 2025
Floor Plan โ 14th Floor (Desai & Associates Tenancy)
Room Key
Room
Occupant / Use
Notes
1401
Vikram Desai โ Senior Partner
Crime scene. Adjacent to Reena's office with shared internal wall. Door opens onto main corridor. Bookshelf on east wall.
1402
Reena Mehrotra โ Junior Partner
Directly adjacent to Room 1401 โ shared wall. Short corridor walk to Vikram's door. Light confirmed on at 20:50 (E03 / E13).
1403
Arjun Nair โ Associate
Far west side. Furthest from lift lobby. Arjun exited at 20:46 (E02).
1404
Conference Room
Shared use. No assigned occupant.
1405
Reception / Waiting Area
Unstaffed after 18:00.
1406
Lata Krishnan โ Office Admin
Lata exited at 20:08, briefly returned at 20:49 to collect an item (E13).
Lift Lobby
Shared โ ICC Tower
Only route to/from 14th floor. Covered by CAM-06. Keycard reader on entry.
Access Route โ Investigator Note
The lift lobby is the sole point of entry and exit for the 14th floor. Anyone entering or leaving the floor during the evening of 6 March 2025 must have passed through the keycard-controlled lift lobby gate. Room 1402 (Reena Mehrotra) is the closest office to Room 1401 on the floor โ the two share a wall, with doors approximately 8 metres apart along the main corridor.